HOME > Project Planning
Contact Us

Phone: +86-21-58660886
Fax: +86-21-58660887
Address: #A308,HuaYuan Bld No.169 TaiGu Road China (Shanghai) Pilot Free Trade Zone
sales@everhydro.com

Project Planning

The design and the selection of the hydroturbine set is involved in complicated calculation and the system engineering of test argument. But we can help you conduct analog computation as long as you input some basic water parameters. Then we will suggest you some suitable types of hydroturbines, which will help you with the construction budget, and make a picture about the project.
Water Head of the Hydropower Station  m
Water Flow of Unit   m³/s
Unit Capacity   kW
Installed Capacity of the Hydropower Station   kW
Output Voltage Grade of the Hydropower Station   kV
Due to the complicacy of the analog computation, we will take one workday to supply the result. Please write down your contact information, we'll give you quick reply after getting the results.
Email
Tel
Code
(*)