Set Home
|
Add to Favorites
|
Company OA
|
Member Login
|
English
Please Select
Services
Engineering consulting
Project Knowledge
Case
Products
HOME
SERVICES
PRODUCTS
ENGINEERING CONSULTING
CASE
PROJECT KNOWLEDGE
HOME
> Project Planning
Product Categories
Turbine
Generator
Auxiliary System
Transformer
Switchgear
PT & CT
Capacitor & Reactor
Transmission Tower
Conductor
Fitting
Insulator
Cable
Busbar
Project Planning
Contact Us
Phone:
+86-21-58660886
Fax:
+86-21-58660887
Address:
#A308,HuaYuan Bld No.169 TaiGu Road China (Shanghai) Pilot Free Trade Zone
sales@everhydro.com
Project Planning
The design and the selection of the hydroturbine set is involved in complicated calculation and the system engineering of test argument. But we can help you conduct analog computation as long as you input some basic water parameters. Then we will suggest you some suitable types of hydroturbines, which will help you with the construction budget, and make a picture about the project.
Water Head of the Hydropower Station
m
Water Flow of Unit
m³/s
Unit Capacity
kW
Installed Capacity of the Hydropower Station
kW
Output Voltage Grade of the Hydropower Station
kV
Due to the complicacy of the analog computation, we will take one workday to supply the result. Please write down your contact information, we'll give you quick reply after getting the results.
Email
Tel
Code
(*)