BENGKULU 3X4MW Hydropower Plant

Location: Indonesian Sumatra Island
Rated Capacity: 4X4MW
Frequency: 50Hz
Rated Water Head: 60 m
Rated Flow: 8.66m3/s

Project Background:
      This project is located at south-west mountain area of Sumatra Island. Unit type is Francis horizontal water turbine. Total installed capacity is 16MW. Three units of 4MW Francis horizontal water turbines of first-stage project were placed in service in June 2012. Scope of service of our company includes selection and procurement of turbine unit, generator unit, PLC silicon controlled rectifier excitation device, governor, main inlet valve and some tools, spare parts etc. We supply services of whole course project supervision, technical advice and guidance in the meantime.

 

Customer Need: 
    1 Model selection of main & auxiliary units of hydroelectric power plant. 
    2 Procurement of main & auxiliary units of hydroelectric power plant.
    3 Process Supervision.
4 On-site technical guidance.
 

Solution:
1 Select best product model and supplier through product information bank and supplier information bank of our company as per customer requirement.
2 Select equipment applicable standard content and make quality plan as per standard information bank content.
3 On-site supervision of production or procurement by professional supervision engineer.
4 Timing feedback of on-site production record and project progress.
5 Inspection of unqualified item and tracking of solution situation etc.
6 Strict project management and progress control to ensure quality project and delivery on time.
7 Whole course technical support of on-site installation service.
8 Detailed document assembly of supervision progress.
 

Customer Profit:
1 Complete equipment procurement within planned schedule conveniently, which effectively avoids influence on time limit for a project.
2 Reduce equipment procurement cost to ensure quality equipment and operation reliability.
3 Real-time understanding of procurement situation through comprehensive supervision service. 
4 Traceable production record and on-site installation record.
5 Whole life cycle service of equipment to improve production efficiency.
6 Reduce investment risk of project and economize operation cost.