We'll provide you some basic configuration and budget of the Hydroturbines and Generators as soon as possible, after we're informed of the hydraulic parameters of the hydropower station which you planned. It'll offer the supports for your project strategic decision....MORE>>
Case for the Equipment Selection of Pelton Hydropower Plant
Power station is diversion power station. Maximal head is 450.5m. Minimal head is 432.4m. Turbine rated head is 435.0m. Installed capacity is 2×13MW. As per head variation range and total installed capacity, 2 units of 13MW vertical shaft impulse water turbine generators are determined to be installed at the power station aft...MORE>>
Case for the Equipment Selection of Axial Flow Hydropower Plant
Power station is run-off river power station. Maximal head is 13.66m. Minimal head is 9.01m. Weighted average head is 12.05m. Weighted average head in flood period is 11.59m. Rated head is 11.2m. Installed capacity is 3X6MW. Guaranteed output of power station is 9MW. Annual utilization hours of installed capacity are 4713h. Annual energy ...MORE>>
Case for the Equipment Selection of Francis Hydropower Plant
Maximal head of power station is 25.7m. Minimal head is 23.3m. Average head is 25.5m. Rated head is 24.8m. Installed capacity is 3×4MW. Operation mode of power station is mainly counter regulation. Generation is also considered. Guaranteed output of power station is 2.87MW. Annual utilization hours of installed capacity are 4491h. Averag...MORE>>